![]() ![]() "trench" means an excavation less than 3.7 m (12 ft) wide at the bottom, over 1.2 m (4 ft) deep, and of any length. ![]() "tilt-up construction" means a system of building construction in which concrete wall panels are placed in position in the permanent structure and temporarily braced or supported "stockpile" means any soil or other loose material that is placed in an area for storage but that is not intended to function as fill "reshoring" means a temporary support system used to support a slab or other structure and withstand loads during a construction project after formwork and falsework have been removed "formwork" means a temporary support system used to contain cast-in-place concrete during a construction project, but does not include falsework "fill" means any soil or other loose material that is constructed to form an embankment or a part of the foundation of a structure or improvement "falsework" means a temporary support structure used to support loads during a construction project "excavation" means any cut, cavity, trench or depression in the earth's surface resulting from rock or soil removal ![]() "demolition" means tearing down, destruction, breakup, razing or removal of the whole or part of a building or structure, or of free standing machinery or equipment that is directly related to the function of the structure "construction project" means any erection, alteration, repair, dismantling, demolition, structural or routine maintenance, painting, land clearing, earth moving, grading, excavating, trenching, digging, boring, drilling, blasting, concreting, the installation of any machinery or any other work deemed to be construction by the Board "asbestos-containing material" has the same meaning as in section 6.1 "application drawings", also known as erection drawings, means drawings that contain the information necessary for the erection, use and dismantling of formwork, falsework, reshoring and associated components and equipment of the formwork, falsework and reshoring "adjacent to an excavation" means within a distance less than or equal to the overall depth of the excavation, measured from a vertical line through the toe of the excavation face Forestry Operations and Similar ActivitiesĢ0.2.1 Notice of project - hazardous substancesĢ0.3 Coordination of multiple employer workplaces SAFE WORK AREAS AND SAFE ACCESSĢ0.14.3 Unstable face of a stockpile BRIDGES AND SIMILAR STRUCTURESĢ0.16 Walkways CONCRETE FALSEWORK AND FORMWORKĢ0.17 Worksite-specific plans required for specified formworkĢ0.18 Certification of worksite-specific plans by professional engineerĢ0.20 Information for worksite-specific plansĢ0.21 Application drawings and supplementary instructions for flyformsĢ0.26.4 Duty to ensure operator's competenceĢ0.28 Manufacturer's, supplier's or integrator's manualĢ0.54 Hopper signal device TILT-UP BUILDING CONSTRUCTIONĢ0.59 Brace removal CONCRETE PRE-STRESSING AND POST-TENSIONINGĢ0.61 Signalling devices and restricted areasĢ0.63 Guarding during pre-stressing operationsĢ0.65 Detensioning and strand cutting proceduresĢ0.71 Securing jacks OPEN WEB JOISTS AND TRUSSESįigure 20-3: Combined supporting and sloping SCALING OPERATIONSĢ0.98 Rappelling and work positioning systemsĢ0.101 Harnesses MARINE CONSTRUCTION, PILE DRIVING AND DREDGINGĢ0.110 Walkway on discharge line DEMOLITIONĢ0.123 Compliance with standards Construction, Excavation and Demolition Definitions ![]() Diving, Fishing and Other Marine Operations Ladders, Scaffolds and Temporary Work Platforms Personal Protective Clothing and Equipment Noise, Vibration, Radiation and Temperature Occupational Health and Safety Regulation ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |